| WESTLONDONCHAT.COM https://b65a9t-westlondonchatcom-7590.site.tb-hosting.com/ |
|
| Civil Engineer for the High Jump https://b65a9t-westlondonchatcom-7590.site.tb-hosting.com/viewtopic.php?f=1&t=995 |
Page 1 of 2 |
| Author: | geezer466 [ Fri Mar 08, 2013 9:47 pm ] |
| Post subject: | Civil Engineer for the High Jump |
http://www.bbc.co.uk/news/uk-england-london-21715329 Quote: Two construction drills broke through into a railway tunnel in east London on a busy First Capital Connect route. Services on the Moorgate to Finsbury Park route were stopped after a driver said muddy water had poured on to his roof near Old Street Station. An hour later, at about 11:00 GMT, two piling drills came through as a train with only a driver and Network Rail manager approached to inspect the area. ![]() Major accident averted I think... If a tube train had hit that drill at speed people would have died. |
|
| Author: | Kremmen [ Sat Mar 09, 2013 7:54 am ] |
| Post subject: | Re: Civil Engineer for the High Jump |
Yep, you would think when drilling that deep they would know where underground tunnels are !!!! |
|
| Author: | vlad the impailer [ Sat Mar 09, 2013 9:02 am ] |
| Post subject: | Re: Civil Engineer for the High Jump |
i used to work for a co that did this sort of stuff,we always had maps of the area,one just hoped they were accurate one time we did stop our van and go over to someone drilling near st johns wood and pointed out to him the mound he was starting to drill on was the top of a "cut and cover" line |
|
| Author: | SOT [ Sat Mar 09, 2013 10:56 am ] |
| Post subject: | Re: Civil Engineer for the High Jump |
| Author: | Jon [ Sat Mar 09, 2013 1:57 pm ] |
| Post subject: | Re: Civil Engineer for the High Jump |
Wow!! Mind you, amazing it doesn't happen more often. |
|
| Author: | Kremmen [ Sun Mar 10, 2013 8:13 am ] |
| Post subject: | Re: Civil Engineer for the High Jump |
I often wonder how watertight the lines going under the Thames are ? Wouldn't take much to flood the system. All we've got is an iron tube which is probably going/gone rusty on the outside and is considerably weaker than when first installed? |
|
| Author: | geezer466 [ Sun Mar 10, 2013 11:17 am ] |
| Post subject: | Re: Civil Engineer for the High Jump |
Kremmen wrote: I often wonder how watertight the lines going under the Thames are ? Wouldn't take much to flood the system. All we've got is an iron tube which is probably going/gone rusty on the outside and is considerably weaker than when first installed? First was completed in 1843..... http://en.wikipedia.org/wiki/Thames_Tunnel Never realised there were so many tunnels and the varying uses they are put too!! http://en.wikipedia.org/wiki/Tunnels_underneath_the_River_Thames Same could be said for the northbound bore of the Blackwall tunnel which was also built in the late 1800's (this is the one with the height limit and the odd bends within it). When the tube was first cut they had to divert around plague pits in the City which contained the remains of those who died in the black death. There was a real worry they would release the virus if they opened the pits. |
|
| Author: | Brian [ Sun Mar 10, 2013 11:28 am ] |
| Post subject: | Re: Civil Engineer for the High Jump |
I seem to remember an automated underground train system operated by the Post Office. |
|
| Author: | geezer466 [ Sun Mar 10, 2013 3:27 pm ] |
| Post subject: | Re: Civil Engineer for the High Jump |
Brian wrote: I seem to remember an automated underground train system operated by the Post Office. http://en.wikipedia.org/wiki/London_Post_Office_Railway Friend of mine used to work on it. |
|
| Author: | SOT [ Sun Mar 10, 2013 6:58 pm ] |
| Post subject: | Re: Civil Engineer for the High Jump |
There is so much tunnelling in London at the moment it's quite incredible On top of The super sewer under the Thames & crossrail running under Oxford st!!!, the £700million Victoria station upgrade involves a huge tunnel from the station, under the bus depot and under the Billy Eliot theatre (can't remember it's name!). Then a huge relief ticket hall is to be built underground in Bressenden place with two staircase shafts coming out nearby (one close to Cardinal place shopping centre). Some tunnels will be built within within 3m of the circle line and between power, sewage and gas mains. At the moment, around 7000 holes are being drilled by compact drilling machines. The holes are filled with grout - a weak concrete - in order to stabilise the ground to stop any subsidence. It's all very fascinating stuff, but lets hope that - contrary to the engineers at this near tube train disaster in Moorgate - they have done their sums right in SW1! |
|
| Page 1 of 2 | All times are UTC + 1 hour [ DST ] |
| Powered by phpBB® Forum Software © phpBB Group http://www.phpbb.com/ |
|